Reinvented: Kingsmill Resort & Spa

From the Virginia Gazette:

Kingsmill will rejuvenate and expand its iconic resort under an ambitious masterplan designed to draw more people here and keep them longer.

Pockets of unused terrain will be filled in while still preserving the vast greenspace that defines Kingsmill.

Drawings reminiscent of those 42 years ago were unveiled Friday, but the new version expands the resort with bold plans to exploit the river setting like never before……

Click HERE to read the entire article.

UPDATE: HERE is another article.

An aerial rendering of the site shows the existing conference center, with the hotel and new conference center in the background.

A swimming area would be bordered by the conference center, a new hotel, and a second conference center.

Plans at the marina, a "future" project, may include an additional dock for larger vessels, such as dinner cruises.

An ornate deck would surround the pool at the tennis and swim club. The Kingsmill logo may be used in the bottom of the pool.

Advertisements

About hemphillbrett

Floorcovering specialist
This entry was posted in Kingsmill, Lodging and tagged , , , , , , , , , , , , , , , , , , , , , , , , , . Bookmark the permalink.

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s